Act No. 220/2004 Coll. · Ownership, Land & Lease

Buying arable land to build on: what has to happen before it becomes a building plot

Arable land on the edge of a village tends to be cheaper than a building plot, and sellers often give assurances that it will be possible to build there. This article explains why that is decided by the land-use plan and the agricultural land protection authority, what withdrawal of land from the agricultural land fund and the levy for it mean, and how to structure the purchase so that the buyer does not pay for land on which building is not permitted.

The offer sounds tempting: land on the edge of the village, next to the road, at the price of arable land, with the seller adding that “the land-use plan already shows it as building land”. Whether it will be possible to build there, however, is decided neither by the price nor by the seller’s word. If the land is recorded in the cadastre as agricultural land, it must first go through the procedure under Act No. 220/2004 Coll. on the protection and use of agricultural land. That procedure cannot be circumvented by contract and its outcome is not certain in advance.

When land counts as agricultural land

Agricultural land means land recorded in the cadastre as arable land, a hop garden, a vineyard, an orchard, a garden or permanent grassland (Section 2(b)). It does not matter whether it lies inside the village or beyond it, nor how it looks on the ground. A garden behind a house in the centre of the village is, from the statute’s point of view, just as much agricultural land as a field out in the countryside. The first step is therefore the title sheet: what type of land is recorded, whether the parcel lies within the built-up area of the municipality, and whether it is subject to encumbrances or a lease.

Without a withdrawal decision there can be no building

The basic rule reads:

Agricultural land may be used for non-agricultural purposes only on the basis of a decision on its withdrawal.

— Section 17(1) of Act No. 220/2004 Coll. (unofficial English translation)

The statute also provides that agricultural land may be used for building purposes only in necessary cases and to a justified extent, and that the land protection authority must protect in particular land classified in quality groups one to four according to the code of the soil-ecological valuation unit, and vineyards (Section 12(1)). High-quality land is therefore protected more strictly when withdrawal is sought.

The application for withdrawal must be accompanied, among other things, by the design documentation, a geometric plan of the areas to be withdrawn, a certificate of the soil-ecological valuation unit and a binding opinion of the land-use planning authority (Section 17(5)). Future use of the land for building purposes must be approved by the land protection authority as early as the approval of the land-use plan (Section 13(2)); that consent is not required where the total area withdrawn does not exceed 1 000 m² (Section 16(2)). A withdrawal decision alone is therefore not enough for building; what the municipal land-use plan says about the land, if the municipality has one, and the binding opinion of the land-use planning authority are decisive too.

A final decision on permanent withdrawal is the basis for issuing a decision on the building project (Section 17(14)) and, on its basis, the cadastre changes the type of land to other area (Section 17(7)). It applies only to the approved project and ceases to be valid if the land is not used for that project within three years of the decision becoming final (Section 17(10)); any levy already paid is not refunded in such a case.

An exception applies to a change in the agricultural type of land with an area of up to 1 000 m² within the built-up area of the municipality, for which no withdrawal decision is issued and the land protection authority issues only an opinion (Section 17(2)(b) and (3)). Even then, however, the land-use plan and the other conditions for building are decisive.

The levy and other obligations

Whoever proposes the non-agricultural use of land pays a levy for its permanent or temporary withdrawal according to the code of the soil-ecological valuation unit (Section 12(2)(l)). It must also strip the humus horizon in accordance with the approved balance sheet, care for the withdrawn land until the building is completed and, when dividing land, must not disrupt the integrity of the fields or create parts unsuitable for farming. The amount of the levy depends on the quality of the soil and may be reflected significantly in the overall price of the land, which is why it should be known before signing.

How to structure the purchase

Until the buyer has verified that the land-use plan permits building and that the land protection authority envisages withdrawal, the buyer is buying agricultural land, not a building plot. Before signing we recommend obtaining information from the municipality about the land-use plan, establishing the quality of the soil, checking access from a public road (see the article on the right of way across another person’s land) and any existing lease (see the article on selling land with a tenant in place), and, where land outside the built-up area is to be divided, the ban on fragmentation described in the question on the ban on fragmenting land. If you are buying before everything has been arranged, the purchase price and its due date should reflect the risk that building will not be possible, for instance through a reservation agreement, a future contract or conditions in the purchase agreement.

We carry out due diligence on the land and prepare a tailored contract as part of our transfers of agricultural land service. Where the land is already a building plot within a municipality, we continue as part of our purchase and sale of land service.

This article provides general legal information as at 12 September 2026. It does not constitute legal services or advice on your specific matter. Laws change and the details of your situation may differ. Check the appropriate course of action or contact us before making a decision.

More articles on Ownership, Land & Lease

All insights
Ownership, Land & Lease

Duplicate ownership before the court: how to frame the claim and what decides the winner

Where a settlement agreement fails, only a court can remove the duplication between register C and register E parcels. This article explains why an owner recorded twice always has an urgent legal interest in a declaratory claim, how to frame the relief sought so that the court does not dismiss it on formal grounds, what has to be proved in the dispute and how the outcome reaches the title sheet.

Read more →
Ownership, Land & Lease

The tenant of business premises is not paying: notice, retention of goods and eviction from non-residential premises

A shop, an office or a warehouse for which the tenant has not paid for months is a double loss for the landlord: the rent is missing and the premises cannot be offered to anyone else. This article explains when the Act on the lease of non-residential premises allows the lease to be terminated by notice, how the landlord’s lien over the tenant’s movables works and what to do when the tenant does not leave after the lease ends.

Read more →
Ownership, Land & Lease

Right of way across another person’s land: agreement, court decision and access when a parcel is divided

Land with no access from a road can be sold, but it is hard to use and harder still to build on. This article explains how a right of way on foot and by vehicle is created by agreement, when a court may create it, why that route is closed for undeveloped land, and what to bear in mind when dividing land so that no new parcel is left without access.

Read more →

Facing a similar situation?

Tell us what you need help with.

Describe your situation. We will review it and usually tell you within 24 hours whether and how we can help, including an indicative fee.

  1. 1Send your enquiry via this form
  2. 2Usually within 24 h you get a price confirmation and plan
  3. 3We start work only after your approval
Mgr. Patrik Tulinský, LL.M. Czech and Slovak attorney · SAK 300422 · ČAK 19654

Not keen on calls or email? Message us on WhatsApp →
Prefer to book a time right away? Book a consultation →
Or email us about this matter.

PDF, Word, images, ZIP… max 10 MB per file, 30 MB total.

Submitting this form does not create an engagement or attorney-client relationship. Before taking on a matter we run a conflict-of-interest check, so please do not send sensitive originals until we confirm the matter together.

Contact a lawyer